Decommissioning of Wied Ghammieq Pumping Station and landscaping works

The Water Services Corporation intends to demolish the existing pumping station and perimeter wall at Wied Ghammieq and embellish the site through approved hard landscaping .  The long standing structure and walls should be demolished and all residual material carted away.  It is the Engineer’s responsibility whether the demolished material can be reused for backfilling of the existing concrete pits.  Any storage of materials should be kept to a minimum and in no circumstance be higher than 3 metres from existing ground.

Drawings

Participation Fee: Closed